O
North Salem, NY
← North Salem, NY

North Salem · issues

Civic issues

Topics getting the most attention in North Salem, NY public meetings, ranked by how frequently they come up.

16 issues (filtered)12 topics
HighDevelopment

Lobdell House porch repair

The Capital Planning Committee suggested the town think harder about whether Lobdell House is the right home for town offices, since fixing the porch, windows, insulation, and roof could total around $400,000. The board will consider shorter-term fixes and other options.

2 mentions (1 this month)Last discussed Oct 27, 2026
MediumDevelopment

Delancey Hall renovations and move-in

The town will seek sealed bids — not just quotes — for interior painting of DeLancey Hall, expected around $35,000, with performance bonds added to protect the town.

4 mentions (1 this month)Last discussed Oct 13, 2026
HighDevelopment

Verizon Equipment Upgrade at 73 Crosby Road

The board is pushing AT&T and other tower tenants to produce accurate as-builts and lease-area maps after a past incident where a contractor dug through a homeowner's septic field — plus a locked gate the ambulance corps can't open.

4 mentions (1 this month)Last discussed Oct 7, 2026
MediumDevelopment

Silver Coup / Nash Road Lot Line Change

Reed Road Group's subdivision lot-line adjustment finally got approved after months of technical back-and-forth. Stormwater DEP sign-off and written highway and fire department approvals remain as conditions.

2 mentions (1 this month)Last discussed Oct 7, 2026
HighDevelopment

Hewlett Property Wetlands Permit / Floodplain Fill

The board toured the Hewlett property and the chair is pushing back on a plan to bring in 380 yards of fill and push a retaining wall into the floodplain, worried about water pushing onto neighbors and emergency access. The applicant was urged to redesign within the already-disturbed area.

1 mention (1 this month)Last discussed Oct 7, 2026
HighDevelopment

Delancey Hall renovation and reopening

Delancey Hall is getting new carpeting while the town works out of rented trailers. The board picked the low bidder but is still sorting out colors and whether stair runners are needed — with a goal of being back in the building before the end of October to avoid another $2,000 in rent.

3 mentionsLast discussed Sep 29, 2026
HighDevelopment

Dish Wireless Bond Default and Cell Tower Removal Security

Dish Wireless, which holds approvals for antennas on two North Salem towers, has filed for Chapter 11 bankruptcy and its surety is canceling the bonds that guarantee equipment removal. By calling the bonds in default while still valid, the town protects roughly $64,000 in removal funds if the antennas are ever abandoned.

1 mentionLast discussed Sep 29, 2026
LowDevelopment

Plus-One ADU Program

The state offers up to $125,000 per household to build accessory apartments for households earning under about $144,000. The town is considering signing on as local administrator but wants to study the program's terms and how other towns have fared first.

1 mentionLast discussed Sep 22, 2026
MediumDevelopment

Cottage Lane residential applications

Three small-lot rebuild projects on Cottage Lane (Watson, Peirce, and a drive-by planned) are moving slowly through review. Peirce's variances were not yet referred to the Zoning Board because the application isn't complete, and neighbors on the small co-op lots will see construction activity if these proceed.

1 mentionLast discussed Sep 2, 2026
MediumDevelopment

Grant Road LLC application at 658 Grant Road

The preliminary subdivision at 658 Grant Road is still pending — its public hearing got carried over to March, so residents will have another chance to weigh in then.

2 mentionsLast discussed Aug 12, 2026
MediumDevelopment

Delancey Hall / Lobdell House building repairs

The town is pressing ahead with renovations: paint mock-ups for doors, a new capital account for Lobdell House repairs including deck work, and plans for dustless floor refinishing and a possible stainless steel railing replacement.

1 mentionLast discussed Jul 28, 2026
MediumDevelopment

Rebuilding after fire on a nonconforming lot

A family whose house burned down needed several variances just to rebuild where their home stood for a century — the lot predates modern zoning rules. It shows how hard it can be to replace a damaged home on a small, older lot.

1 mentionLast discussed Jul 9, 2026
MediumDevelopment

Peach Gardens co-op rebuild and floodplain constraints

Rebuilding a floodplain cottage in Peach Gardens means losing your nonconforming grandfathered status, forcing a stack of variances. The board agreed the floodplain rules effectively force demolition over renovation.

1 mentionLast discussed Jun 11, 2026
HighDevelopment

Hawley Woods subdivision approval

A proposal to create three house lots on 40 acres off Hawley Road with a shared driveway, private wells, septic systems and 10,000-gallon fire-suppression water tanks per lot. Downhill neighbors worry a septic system sits about 12 feet from their property line and that drainage may reach their land.

14 mentionsLast discussed Jun 3, 2026
LowDevelopment

Gilport subdivision long extension

The Oakridge/Overlook Road subdivision has now received eighteen 90-day extensions of its plat approval; the current owner is marketing the property, and the road-or-bond question remains unresolved.

1 mentionLast discussed Apr 1, 2026
MediumDevelopment

APC Group subdivision extension at 4 Hardscrabble Road

APC Group's preliminary plat approval was extended 90 days to May 7. The applicant says the health department is ready to sign the final plat, so the project may be moving toward final approval soon.

2 mentionsLast discussed Feb 4, 2026